The cafeteria of a college serving 3,000+ students and staff, photographed after five months of continuous use.

Client
Franklin College
Location
Grimsby
Sector
Education
System
EP 104 epoxy with APU 46 matt polyurethane
Coffee shop service counter with dark floor finish, six months after completion

Originally a couple of serveries joined by a corridor the area was transformed this summer into a larger, more open space where students could not only eat but also study in a less formal setting than a classroom or library. It is still one of the main corridors linking various areas of the building but has now been transformed into a central hub for communal and social interaction and learning.

The job required a seamless and hard-wearing floor surface that was easy to clean and would add to the contemporary look of the project. As cost was also an important factor it was decided to use a more cost-effective epoxy base coat and seal it with a hard-wearing polyurethane sealer. The high levels of UV from the floor to ceiling windows also required a photo-stable polyurethane.

The floor was primed with EP 70, coated in EP 104 and sealed with APU 46 Matt Sealer in Anthracite.

As well as its photo-stable qualities APU 46 was selected as it is extremely resistant to water-based solutions and diluted acids and alkalis. The product is very resistant to staining from household chemicals, strongly dyeing foodstuffs and drinks like beer, red wine or coke so is ideal for this situation. The matt surface also reduces the light dispersion of the surface and reduces glare and obvious marking.

The photo’s in the gallery show the preparation of the sub-base, application of primer, base coat and sealed surface, as you would expect. But we have also shown you the “hammer” it received less than 24 hours later when the kitchen fitters arrived the day after the floor had been sealed.

We also wanted to show how well the surface has stood up to the test of time so all completed photographs were taken when the floor had been down for five months and in continuous use for that time.

Project photos

Cafeteria floor space prepared for protective coating application
The cafeteria floor in its preparation stage before coating application.
Operative applying Achtis EP 104 protective coating in a cafeteria space
An operative applies Achtis EP 104 coating to prepare the cafeteria floor.
Cafeteria floor primed with Achtis EP 70 basecoat during preparation phase
Cafeteria floor prepared with Achtis EP 70 primer basecoat during system preparation.
Dark sealed cafeteria floor with Achtis APU 46 protective coating
Achtis APU 46 creates a durable, sealed finish on the cafeteria floor.
Cafeteria floor surface photographed two days after sealer application and curing
Cafeteria floor evaluated two days after sealer coat application and initial curing.
MDF servery backboards coated with Achtis APU 46 for durability and protection
Achtis APU 46 protects MDF backboards in the main cafeteria servery areas.
Sealed cafeteria floor two days after sealer application, showing an even finish
Cafeteria floor demonstrates the durability and even finish two days after sealer application.
Commercial cafeteria floor with dark finish, six months after Achtis APU 46 application
Main cafeteria floor system completed with Achtis APU 46 finish after six months of service.
Commercial cafeteria interior with dark floor finish, six months after application
Main cafeteria area evaluated six months following the completion of floor application.
Coffee shop service counter with dark floor finish, six months after completion
Coffee shop interior with applied floor system, captured six months after installation.
Commercial corridor floor with dark finish, evaluated six months after completion
Main corridor floor system documented at the six-month evaluation point.