Call to discuss your project today +44 (0)1472 240 340

Case studies  /  Education

Franklin College, Grimsby

The cafeteria of a college serving 3,000+ students and staff, photographed after five months of continuous use.

Client
Franklin College
Location
Grimsby
Sector
Education
System
EP 104 epoxy with APU 46 matt polyurethane
Coffee shop service counter with dark floor finish, six months after completion

At Franklin College in Grimsby, a couple of serveries joined by a corridor became a larger, more open space. Students can now eat there and also study in a less formal setting than a classroom or library. It is still one of the main corridors linking different parts of the building. Now, however, it is also a central hub for socialising and learning.

What the floor needed

The college needed a seamless, hard-wearing floor that was easy to clean and suited the contemporary look of the project. Cost mattered too, so the specification paired a cost-effective epoxy base coat with a hard-wearing polyurethane sealer. In addition, the floor-to-ceiling windows let in high levels of UV, so the polyurethane had to be photo-stable.

The installers primed the floor with EP 70, coated it in EP 104 and sealed it with APU 46 Matt Sealer in Anthracite.

Besides being photo-stable, APU 46 is extremely resistant to water-based solutions and to diluted acids and alkalis. It also resists staining from household chemicals, strongly coloured foods and drinks such as beer, red wine and cola, so it’s ideal for a cafeteria. What’s more, the matt surface reduces glare and hides marks.

The floor after five months

The gallery photos show each stage: preparing the sub-base, then the primer, the base coat and the sealed surface. They also show the “hammer” the floor took less than 24 hours later, when the kitchen fitters arrived the day after sealing.

We also wanted to show how well the surface has stood the test of time. So we took all the finished photos after the floor had been down, and in constant use, for five months.

Project photos

Cafeteria floor space prepared for protective coating application
The cafeteria floor in its preparation stage before coating application.
Operative applying Achtis EP 104 protective coating in a cafeteria space
An operative applies Achtis EP 104 coating to prepare the cafeteria floor.
Cafeteria floor primed with Achtis EP 70 basecoat during preparation phase
Cafeteria floor prepared with Achtis EP 70 primer basecoat during system preparation.
Dark sealed cafeteria floor with Achtis APU 46 protective coating
Achtis APU 46 creates a durable, sealed finish on the cafeteria floor.
Cafeteria floor surface photographed two days after sealer application and curing
Cafeteria floor evaluated two days after sealer coat application and initial curing.
MDF servery backboards coated with Achtis APU 46 for durability and protection
Achtis APU 46 protects MDF backboards in the main cafeteria servery areas.
Sealed cafeteria floor two days after sealer application, showing an even finish
Cafeteria floor demonstrates the durability and even finish two days after sealer application.
Commercial cafeteria floor with dark finish, six months after Achtis APU 46 application
Main cafeteria floor system completed with Achtis APU 46 finish after six months of service.
Commercial cafeteria interior with dark floor finish, six months after application
Main cafeteria area evaluated six months following the completion of floor application.
Coffee shop service counter with dark floor finish, six months after completion
Coffee shop interior with applied floor system, captured six months after installation.
Commercial corridor floor with dark finish, evaluated six months after completion
Main corridor floor system documented at the six-month evaluation point.

More case studies