Systems · ErreLAB · Pietra Continua finish
ErreLAB Travertino
The light-and-shadow movement of classic travertine, as one continuous floor with no grout lines.

What it is
Travertino recreates the chiaroscuro of one of history’s best-loved building stones. Base Pietra is spread in a single coat, then, while it’s still wet, beaten firmly and evenly with the trowel and lightly smoothed in a checkerboard pattern.
When it’s dry it’s sanded, then given a mopped-on colour veil of Velopietra TR and earth pigment, which settles into the texture. One coat of matt Top Clear protects the finish.
Travertino is a floor finish, for indoor use. For outside, use Travertino Outdoor from the Pietra Continua Outdoor range.
It’s naturally pigmented with clays and oxides and enriched with lava powder, quartz and mica. The decorative shades come from R745 Terre colorant codes N24, N12 and N08, and the colour veil uses 40 g of R420 Velopietra TR per square metre. Mix mechanically for at least two minutes until even.
Top Clear comes in three transparent finishes: Lucido (gloss), Satinato (satin) and Opaco (matt). ErreLAB recommends Opaco for Pietra Continua.
At a glance
- Base
- R303 Base Pietra 143
- Coats
- One coat, about 1.2 kg/m²
- Colour veil
- Velopietra TR with earth pigment, by mop
- Sealer
- One coat of Top Clear Opaco (matt)
- Cycle
- 2 days
- Use
- Indoor floors and worktops
Three colourways
The colourway comes from the earth pigment in the colour veil.

Style

Elegance

Trend
Key features
See the finish
5 photos
Colours
Each stone finish comes in Elegance, Style and Trend colourways.
Installation
Best applied by a trained installer. The cycle takes 2 days. The ErreLAB application manual gives full details.
How Travertino is applied
- Day 1: spread Base Pietra 143 in a single coat of about 1.2 kg/m². While it’s wet, beat it densely and evenly with the trowel, then lightly smooth it in a checkerboard pattern.
- Once dry, sand with 80–120 grit discs and vacuum thoroughly.
- Day 2: mix Velopietra TR with three times its weight of water and 2% earth pigment, then mop it evenly over the floor.
- After 6 hours, apply one coat of Top Clear Opaco with a plastic trowel.
Want to apply it yourself? See our training courses, or call us to talk through your project.
Videos
ErreLAB’s own videos are in Italian, but the technique speaks for itself.
Planning a Travertino floor?
We’ll help you choose a colourway, send samples and talk you through the build-up for your substrate.



